Readyfast

COI Inspection Checklist: What to Have Ready

A Certificate of Inspection renewal goes smoothly when the inspector finds what they're looking for in the first ten minutes. This checklist covers what a Subchapter T operator should have ready: the application, the paperwork, the lifesaving gear and its service records, and the drill and test logs that prove the boat is run the way the COI says.

What the Inspection Is For

A renewal inspection checks that the boat is in satisfactory condition, fit for its intended service and in line with the regulations. It normally covers structure, machinery and equipment, plus rigging and sails on a sailing vessel. The owner or operator runs whatever tests the OCMI asks for, makes the boat available for the required inspections and drills, and the OCMI can have you get underway (46 CFR 176.404(a)).

1. Start Early: The Application

Your written application for renewal must reach the OCMI at least 30 days before the COI expires (46 CFR 176.404(b)). Missing this is the easiest way to end up tied to the dock. Put the date on your calendar 60 days out so you have time to book the inspection and fix anything first.

A Subchapter T COI is good for 5 years (176.107). In between, you schedule an annual inspection with the OCMI within 3 months either side of each anniversary date. No written application is needed for it, and the COI stays valid only if each annual is done and endorsed (176.500, 176.502). The annual covers the same ground in less detail, so this checklist works for both.

2. Paperwork Aboard

3. Lifesaving Equipment and Service Records

Inspectors look at the gear and at the paper behind it. Have these ready:

ItemWhat to have readySource
EPIRBMonthly self-test done and logged (an EPIRB packed in a liferaft is exempt); battery replaced after use or before its expiry date, whichever is first185.728
Inflatable liferaft or inflatable buoyant apparatusServiced at a facility approved for that brand by the date on its servicing sticker (can slip to the next vessel inspection, up to 5 months); serviced again if the container is damaged or straps or seals are broken185.730(a)
Inflatable and hybrid life jacketsServiced within 12 months of initial packing and every 12 months after (same 5-month allowance)185.730(b)
Hydrostatic release unitsReusable: serviced within 12 months of manufacture and every 12 months after (same 5-month allowance). Disposable: marked with an expiry date 2 years after installation185.740
Survival craft, rescue boat, launching gearLife floats and buoyant apparatus count as survival craft, so most T-boats have these checks. Weekly visual check (and rescue boat engine run ahead and astern for at least 3 minutes); monthly check against the maker's instructions; winch controls every 3 months; rescue boat strip-down and davit and falls inspection yearly175.400, 185.720–185.726
Visual distress signalsSix red hand flares and six orange smoke signals on Oceans, Coastwise and Limited Coastwise routes (three of each on lakes, bays, sounds and rivers), in date, in a marked watertight container at the operating station or a pyrotechnic locker near it. Boats on runs of about 30 minutes from the dock are exempt180.68
Expired items and batteriesAt each annual inspection, replace any lifesaving item past its expiry date, any battery past its date (equipment in an inflatable liferaft is handled at servicing), and every battery with no date on it185.726(c)–(e)

Also walk the boat: everything your COI lists is aboard, stowed as the rules require, in good condition and with the right markings.

4. Fire Protection

5. Drill and Test Logs

Expect to be asked for these, and expect the inspector to watch a drill. Drill entries must show at least the date and a general description of the scenario and training topics (185.520(f), 185.524(d)). Crew training entries need the date and a general description of the topics (185.420(d)). Overnight boats also need passenger egress drill entries with date, time and number of participants (185.507(b)). The inspection office we asked looks for monthly drills and covers egress training in each fire drill; ask yours what it expects. Our drill requirements guide covers each one.

6. Crew and Credentials

7. Machinery and the Boat Itself

The inspector will look at the hull, machinery, steering, bilge system and electrical installation. Fix known leaks, loose wiring and anything that's been "on the list" before they arrive.

Be ready to run these for the inspector (176.804):

Also know when your hull exam is due. A drydock and internal structural exam is required at least every 2 years if the boat has spent more than 3 months in salt water in any 12-month period since the last one, and every 5 years otherwise (176.600). A steel or aluminum boat under 15 years old with an effective hull protection system can apply, at least 90 days ahead, for an underwater survey in place of every other drydock, and the OCMI decides. An older steel or aluminum boat can apply to the District Commander if its last drydock hull gaugings showed no real wear. Fiberglass and wood hulls don't qualify (176.615). There's no fixed tailshaft interval; the inspector can have it drawn if its condition is in question (176.670).

Common Reasons Boats Get Held Up

Keep It All in One Place

Readyfast tracks your COI, service dates, drills and crew credentials, warns you at 60 and 30 days, and puts it all in one Boat Report you can show the inspector. Try the Demo, no sign-up needed.

Readyfast is independent and is not affiliated with or endorsed by the U.S. Coast Guard. This checklist summarizes the regulations as of November 2026 and doesn't replace them; always check the current text at ecfr.gov and follow your COI and your OCMI.